Welcome to BuildCraft Construction — where craftsmanship meets commitment, and every project is a step toward building lasting relationships. Since our inception in 2020, we have been driven by a simple yet powerful mission: to transform the construction experience through quality, trust, and personalized service.

FOLLOW US ON:

Get in touch!

Packages

Core & Structure

1299 / per Sft

Design and Drawings

  • 2D  Floor Plans & 3D Elevation Design 
  • Internal isometric views - All rooms, open areas etc.
  • Architectural Design - All necessary Working Drawings, schedule of
  • openings, section, elevation & Detailed portfolio of the home post handover 
  • Design Development - A maximum of 3 of drawing revisions per drawing 
  • Interior Design - 2D furniture layout, assistance in material procurement, 3D interior designs if executed by bAh
  • Structural Design - Structural Design & GFC Drawings, Soil test report, Design Analysis Report & Overlapped Structural,
  • Architectural & MEP Drawings MEP Design - Electrical layout, Plumbing Waterline layout Plumbing Drainage layout.
  • buildAhome will provide liaison assistance with different government agencies (Plan approval, Electrical, Water & Sewage Connection)
  • Visual site survey & drawing on the basis of measurement provided by clients & site survey by surveyor with instruments & drawing on the basis of survey

Civil Construction

  • Floor to floor height - 10’6”
  • Steel (500 TMT bars) - Bhuwalka/Kamadhenu
  • Cement (Grade 53) - ACC/Penna/Dalmia
  • UG Sump built with solid blocks of 8” thickness & waterproof
  • plastered of 8000 lts
  • Concrete  M20 grade RMC
  • Machine Cut Solid Block walls - 6 & 4 thickness
  • Internal, external and toilet wall - column joints plastering with
  • chicken mesh using Double washed M sand
  • Waterproofing compound - Dr. Fixit/FOSROC for external walls
  • Steel/concrete lofts - Not Included
  • Anti termite treatment

MEP Designing

  • Designed as per standards and as required by client

Electrical

  • Laying conduits as per drawing including chipping of necessary civil structures
  • Conduits shall be laid for all requirements like AC, UPS etc includes futuristic conduit provision like EV charging
  • provision for solar panel connectivity

Doors

  • Fixing of Door frames is included
  • All material including the wood grill clamp, bitumen for paint, etc. are not included and have to be provided by the client
  • All the materials with respect to doors and frames has to be provided by the client and shall be fixed only if delivered within date as per schedule.

Windows

  • Fixing of window grill or frames is included
  • All material including the wood grill clamp, bitumen for paint, etc. are not included and have to be provided by the client
  • All the materials with respect to doors and frames has to be provided by the client and shall be fixed only if delivered within date as per schedule

Compound Wall

  • Compound wall - Solid black walls of 4” thickness to suit the elevation (if charged)
  • Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
  • Compound wall of 5 Feet height
  • Compound wall - Plastered only

Elevation

  • This proposal includes aesthetically pleasing elevation design

Exclusions & Incidentals

  • This is a customised Shell & Core package for those who want to completely customise the finishes of their home & experience complete freedom. The foundation, complete structure include plinth beams, columns, slab, walls, electrical conduits & internal + external plaster to the walls are included within the scope. The quoted price includes all specifications as listed below.
  • Government fees for the liaison bodies to be paid directly by the client
  • The complete fee payment for plan sanction in Panchayat limits need to be bone by client
  • A design if needed to be modified more than thrice shall be charged for accordingly
  • Assuming the site & road level to be equal, if the ground level needs to be raised above 18", it shall be charged for accordingly
  • Hard rock/soft rock excavation, if it arises shall be charged for accordingly
  • Buying new earth/sending existing earth for excavation/backfilling purpose shall be changed on actual
  • There is no basic price/ CAP of steel or cement. However, in case there is huge fluctuation of over 45% of the average market price during the signing of the agreement the difference shall be charged in consultation with the client
  • Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
  • One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
  • SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions
  • If there is constraints in material delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals
  • A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
  • Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
  • Site related small costs like tarpaulin, temporary wiring within the site & etc, are included and no additional cost.
  • Only above mentioned will be executed only the shell of the building and no other works is not included in the package

Warranty and Guarantee

  • Construction guarantee - 1 Year Guarantee & warranty is provided on Stamp paper

The Complete Labour

599 / per Sft

All Mason Only Works

Supply of Barbending Workers

Supply of Electrical Workers

Supply of Plumbing Workers

Supply of Painting Workers

Supply of Tiles Workers